1 00:00:01,568 --> 00:00:04,571 EVA 95 will begin at the Quest Airlock 2 00:00:04,771 --> 00:00:09,309 EV-1 noted by red stripes will egress, followed by EV-2. 3 00:00:09,309 --> 00:00:12,979 Plan asks include a Planar Reflector removal and replacement, 4 00:00:12,979 --> 00:00:15,715 external high definition camera replacement, 5 00:00:15,715 --> 00:00:19,352 radiator re-tork, and multiple thermal and power jumper tasks. 6 00:00:19,552 --> 00:00:22,555 The crew members will be at separate work sites for the start of the EVA, 7 00:00:22,622 --> 00:00:25,492 but will end up together for the tasks near the end. 8 00:00:25,492 --> 00:00:29,929 EV-1 will translate to the robotic arm to set up for the Camera Port 3 9 00:00:29,929 --> 00:00:33,967 external high definition camera removal and replacement. 10 00:00:34,834 --> 00:00:39,672 This task will enable high definition views from the Camera Port 3 location 11 00:00:39,672 --> 00:00:42,675 after the completion of the task. 12 00:00:46,379 --> 00:00:51,684 Meanwhile, EV-2 will begin translating to the Node 2 Forward Port 13 00:00:51,851 --> 00:00:54,854 for the Planar Reflector removal and replacement. 14 00:00:55,655 --> 00:00:59,259 This is the highest priority task for EVA 95. 15 00:01:10,770 --> 00:01:15,842 After arriving at the Node 2 Forward Port, EV-2 will set up his equipment, 16 00:01:16,142 --> 00:01:19,145 or her equipment, and take photos of the area. 17 00:01:28,388 --> 00:01:32,492 EV-2will then remove the existing Planar Reflector and install the new one. 18 00:01:33,126 --> 00:01:37,597 This task is similar to what NASA astronaut Sunny Williams performed on 19 00:01:37,597 --> 00:01:40,934 U.S. EVA-91 at the Node Two Zenith Port. 20 00:01:41,434 --> 00:01:44,437 The reflector is held in place with three bolts. 21 00:01:55,515 --> 00:02:00,620 With the new Planar Reflector installed, EV-2 cleans up the Node two Forward Port 22 00:02:00,620 --> 00:02:03,923 worksite and heads back toward the airlock 23 00:02:21,007 --> 00:02:23,009 Back over to EV-1. 24 00:02:23,009 --> 00:02:29,315 Our crew member is now at Camera Port Three worksite and is setting up equipment 25 00:02:29,315 --> 00:02:32,352 EV-1 will be removing the Camera Port Three external high 26 00:02:32,352 --> 00:02:35,355 definition camera and replacing it with the new unit. 27 00:02:56,843 --> 00:03:00,113 With the camera replacement complete, EV-1 returns to the airlock 28 00:03:00,113 --> 00:03:01,214 to stow the old camera. 29 00:03:09,789 --> 00:03:12,258 EV-1 then translates to the robotic arm 30 00:03:12,258 --> 00:03:15,261 to head to the Alpha Magnetic Spectrometer worksite. 31 00:03:22,669 --> 00:03:24,404 Back over to EV-2. 32 00:03:24,404 --> 00:03:29,275 EV-2 is retrieving the Early Ammonia Servicer jumper from the Zenith Airlock 33 00:03:29,542 --> 00:03:32,545 and translating to the S6 worksite. 34 00:03:54,601 --> 00:03:56,636 On the way to the Early Ammonia Servicer 35 00:03:56,636 --> 00:04:01,507 Jumper work site, EV-2 installs a gap spanner at S6. 36 00:04:04,077 --> 00:04:05,311 EV-2 then performs 37 00:04:05,311 --> 00:04:08,314 the Early Ammonia Servicer jumper task. 38 00:04:14,854 --> 00:04:17,490 And back over to EV-1 who's on the robotic arm 39 00:04:17,490 --> 00:04:20,493 maneuvering to the Alpha Magnetic Spectrometer. 40 00:04:22,895 --> 00:04:25,331 EV-1 is re-torking 46 bolts on the 41 00:04:25,331 --> 00:04:30,036 Alpha Magnetic Spectrometer Wake Radiator. 42 00:04:33,439 --> 00:04:35,842 At the completion of the radiator task, 43 00:04:35,842 --> 00:04:38,344 EV-1 is maneuvered away from the Alpha Magnetic Spectrometer 44 00:04:38,344 --> 00:04:42,582 to perform robotic arm cleanup before meeting EV-2 45 00:04:42,782 --> 00:04:46,586 on the starboard truss for upcoming thermal and power jumper tasks. 46 00:04:53,026 --> 00:04:54,394 Back to EV-2, 47 00:04:54,394 --> 00:04:57,563 with the Early Ammonia Servicer jumper task complete, 48 00:04:58,064 --> 00:05:00,466 EV-2 moves along to perform the 49 00:05:00,466 --> 00:05:04,771 S6 DC to DC Converter Unit jumper install. 50 00:05:04,904 --> 00:05:08,741 This task will increase primary power system fault tolerance. 51 00:05:10,543 --> 00:05:12,178 And with EV-1, EV-1 52 00:05:12,178 --> 00:05:15,181 is now translating outboard to the S5/S6 Truss. 53 00:05:20,153 --> 00:05:22,722 EV-1 is now at the S5/S6 Truss location, 54 00:05:22,722 --> 00:05:28,161 performing the installation of the S5/S6 Photo Voltaic Thermal Control System 55 00:05:28,161 --> 00:05:30,496 jumper relocate. 56 00:05:30,496 --> 00:05:34,801 And similarly, EV-2 is now at the S4/S5 location 57 00:05:34,801 --> 00:05:40,139 performing the installation of the S4/S5 Photovoltaic Thermal Control System 58 00:05:40,139 --> 00:05:42,075 jumper relocate. 59 00:05:42,075 --> 00:05:46,179 These jumper relocations are in preparation for a future EVA task 60 00:05:46,446 --> 00:05:50,817 to perform a refill of the Photovoltaic Thermal Control System 61 00:05:51,017 --> 00:05:54,020 One Bravo Radiator. 62 00:05:56,522 --> 00:05:59,392 EV-1, then heads for the last planned task 63 00:05:59,392 --> 00:06:03,062 The S4 DC to DC Converter Unit jumper install. 64 00:06:03,596 --> 00:06:06,933 Similar to EV-2’s S6 power jumper install, 65 00:06:07,333 --> 00:06:12,372 This task at S4 will increase the primary power system fault tolerance. 66 00:06:34,260 --> 00:06:38,364 With the planned tasks complete, EV-1 and EV-2 now translate 67 00:06:38,364 --> 00:06:46,305 back to the Quest Airlock for a successful completion of EVA 95.