1 00:00:02,570 --> 00:00:06,930 Luca parmitano Andrew Morgan will be 2 00:00:04,950 --> 00:00:09,540 conducting a MSE VA number for the 3 00:00:06,930 --> 00:00:11,610 finally via in the repair series drew 4 00:00:09,540 --> 00:00:15,089 Morgan will be the eveyone spacewalker 5 00:00:11,610 --> 00:00:16,890 and Ronnie SSRMS the canadarm2 here you 6 00:00:15,089 --> 00:00:18,660 see him translating up the Zetas Berg to 7 00:00:16,890 --> 00:00:22,320 compare the canadarm2 for the EBA 8 00:00:18,660 --> 00:00:23,279 followed by Luca the arm will be waiting 9 00:00:22,320 --> 00:00:24,840 for them on the front of the truss and 10 00:00:23,279 --> 00:00:26,820 they will set up would fixed under to 11 00:00:24,840 --> 00:00:28,260 extend the reach of the arm as well as a 12 00:00:26,820 --> 00:00:29,640 particularly portable foot restraint 13 00:00:28,260 --> 00:00:47,910 that will carry through to the AMS 14 00:00:29,640 --> 00:00:50,190 worksite uh Drew's impressing the arm 15 00:00:47,910 --> 00:00:53,039 Luca will collect a bag full of mo line 16 00:00:50,190 --> 00:00:54,780 and he will translate out to ELC to and 17 00:00:53,039 --> 00:00:58,070 prepare our worksite and tags and tools 18 00:00:54,780 --> 00:00:58,070 for jurors arrival 19 00:01:00,680 --> 00:01:03,829 [Music] 20 00:01:03,870 --> 00:01:08,740 drool then fly up overtop of the ISS and 21 00:01:07,060 --> 00:01:11,500 past AMS to wrap the arm around behind 22 00:01:08,740 --> 00:01:13,450 and underneath of AMS to start the leak 23 00:01:11,500 --> 00:01:16,630 checks at the nadir worksite our two 24 00:01:13,450 --> 00:01:23,280 fittings will have leak checks conducted 25 00:01:16,630 --> 00:01:23,280 [Music] 26 00:01:28,610 --> 00:01:31,689 [Music] 27 00:01:32,079 --> 00:01:36,380 once drew is that that works like he'll 28 00:01:34,189 --> 00:01:38,119 peel back the MLI exposing to fittings 29 00:01:36,380 --> 00:01:41,149 and use the visual leakin Decatur's to 30 00:01:38,119 --> 00:01:42,860 verify that they are leaf tight Luca 31 00:01:41,149 --> 00:01:45,590 will meanwhile check six fittings at the 32 00:01:42,860 --> 00:01:48,439 VSP worksite wall drew flies up to the 33 00:01:45,590 --> 00:01:50,810 Xenocide of AMS to remove the mud flap 34 00:01:48,439 --> 00:01:53,679 and the shower cap to expose the AMS new 35 00:01:50,810 --> 00:01:53,679 radiator system 36 00:01:58,260 --> 00:02:02,299 [Music] 37 00:02:00,100 --> 00:02:04,190 Luke Andrew will also work together to 38 00:02:02,299 --> 00:02:06,530 install an MLA ten underneath of the AMS 39 00:02:04,190 --> 00:02:09,739 pump system to close out the former 40 00:02:06,530 --> 00:02:11,810 debris shield worksite with the eight 41 00:02:09,739 --> 00:02:13,790 leak checks and the MLI installed and 42 00:02:11,810 --> 00:02:16,430 those are complete the crew will clean 43 00:02:13,790 --> 00:02:17,959 up ELC - Andrew will start flying back 44 00:02:16,430 --> 00:02:20,390 to the airlock while Luca removes the 45 00:02:17,959 --> 00:02:21,819 foot restraint from ulc - it translates 46 00:02:20,390 --> 00:02:24,520 it back to the front of station for 47 00:02:21,819 --> 00:02:27,709 future EVs 48 00:02:24,520 --> 00:02:27,709 [Music] 49 00:02:40,150 --> 00:02:44,470 the true will fly from the Xenocide of 50 00:02:42,010 --> 00:02:46,320 AMS back over top of the trust back to 51 00:02:44,470 --> 00:02:49,449 face one to D configure the arm 52 00:02:46,320 --> 00:02:49,449 [Music] 53 00:02:50,950 --> 00:02:55,090 once the SSRMS is d configured and all 54 00:02:53,470 --> 00:02:57,370 the bags have been stowed if the careers 55 00:02:55,090 --> 00:02:58,990 any arranged in time they will perform 56 00:02:57,370 --> 00:03:02,050 some get ahead including some runs 57 00:02:58,990 --> 00:03:05,400 filter removals and battery get ahead 58 00:03:02,050 --> 00:03:05,400 since to prepare for these shrevie days