1 00:00:00,650 --> 00:00:05,160 Luca parmitano Andrew Morgan will once 2 00:00:03,300 --> 00:00:06,810 again be going out on a Messi VA this 3 00:00:05,160 --> 00:00:09,780 will be e VA number three in the repair 4 00:00:06,810 --> 00:00:11,190 sequence this is the VA with a new AMS 5 00:00:09,780 --> 00:00:15,809 pump system will be brought out of the 6 00:00:11,190 --> 00:00:18,000 airlock and installed on AMS itself the 7 00:00:15,809 --> 00:00:19,260 pump system is rather large and cannot 8 00:00:18,000 --> 00:00:20,820 be transported by a single crew member 9 00:00:19,260 --> 00:00:22,920 therefore both crew work together 10 00:00:20,820 --> 00:00:24,570 handing off the pump system one to the 11 00:00:22,920 --> 00:00:26,099 other as they inch worm their way from 12 00:00:24,570 --> 00:00:27,750 the airlock all the way to the forward 13 00:00:26,099 --> 00:00:30,380 side of the external support platform 14 00:00:27,750 --> 00:00:30,380 number two 15 00:00:31,670 --> 00:00:36,960 the canadarm2 or SSRMS will meet the 16 00:00:34,710 --> 00:00:38,520 crew there at what point drew will take 17 00:00:36,960 --> 00:00:40,380 control of the pump system while Luca 18 00:00:38,520 --> 00:00:43,640 ingresses the articulating portable foot 19 00:00:40,380 --> 00:00:43,640 restraint on the SSRMS 20 00:00:45,250 --> 00:00:49,719 once in the photo strange Luca will take 21 00:00:47,469 --> 00:00:52,420 the pump system and prepare for the 22 00:00:49,719 --> 00:00:55,449 flight of the canadarm2 from ESP to all 23 00:00:52,420 --> 00:00:56,829 the way over top of the trust AMS in a 24 00:00:55,449 --> 00:01:08,110 similar manage of the trajectories he's 25 00:00:56,829 --> 00:01:10,270 taken on EVs 1 & 2 well he's riding the 26 00:01:08,110 --> 00:01:12,070 Canada arm to drill we'll translate and 27 00:01:10,270 --> 00:01:15,159 of her hand across the truss and up to 28 00:01:12,070 --> 00:01:16,840 ELC - with bags to prepare the work site 29 00:01:15,159 --> 00:01:23,619 to meet Luca therefore the installation 30 00:01:16,840 --> 00:01:25,960 of the pump system drew will provide 31 00:01:23,619 --> 00:01:28,630 eyes on to assist Luca and aligning the 32 00:01:25,960 --> 00:01:31,710 system and install it on to AMS into the 33 00:01:28,630 --> 00:01:31,710 mechanical attachment device 34 00:01:32,500 --> 00:01:37,510 once there the crew will use the pistol 35 00:01:35,020 --> 00:01:39,220 grip tool to PGT to connect the bolts as 36 00:01:37,510 --> 00:01:42,280 well as connecting the power and data 37 00:01:39,220 --> 00:01:44,380 cables securing the new pump system to 38 00:01:42,280 --> 00:01:46,770 AMS and allowing the heaters to be 39 00:01:44,380 --> 00:01:46,770 activated 40 00:01:54,350 --> 00:01:59,030 once the system has been powered on 41 00:01:56,240 --> 00:02:01,130 it'll be prepared for the fluid 42 00:01:59,030 --> 00:02:03,590 connections which Luca will do from a 43 00:02:01,130 --> 00:02:05,780 different work site on AMS the SSRMS 44 00:02:03,590 --> 00:02:08,119 will carry him from the zenith side to 45 00:02:05,780 --> 00:02:11,380 the aft side here and he slides in to 46 00:02:08,119 --> 00:02:11,380 get ready for those fluid connections 47 00:02:14,150 --> 00:02:18,170 [Music] 48 00:02:16,240 --> 00:02:19,850 there'll be six flu connections 49 00:02:18,170 --> 00:02:22,520 completed here at this VSP worksite 50 00:02:19,850 --> 00:02:25,760 using commercial off-the-shelf wages 51 00:02:22,520 --> 00:02:27,680 thus wages have been encased in a custom 52 00:02:25,760 --> 00:02:29,030 fitting that the engineering team to 53 00:02:27,680 --> 00:02:30,920 develop to allow the astronauts 54 00:02:29,030 --> 00:02:34,450 pressurized gloves to operate the small 55 00:02:30,920 --> 00:02:34,450 Farrell's of the swage 56 00:02:36,430 --> 00:02:41,360 once those six wages are completed the 57 00:02:38,780 --> 00:02:46,069 SSRMS will take Luca to the underside of 58 00:02:41,360 --> 00:02:47,989 AMS for two finals wages drew will have 59 00:02:46,069 --> 00:02:50,060 to pass the tubes from the new pump 60 00:02:47,989 --> 00:02:51,829 system down through a passageway in AMS 61 00:02:50,060 --> 00:02:54,519 to allow Luca to connect those on the 62 00:02:51,829 --> 00:02:54,519 nadir side here 63 00:02:54,700 --> 00:03:00,230 while that NATO worksite Luka will have 64 00:02:57,319 --> 00:03:02,420 to be mindful of several hazards to AMS 65 00:03:00,230 --> 00:03:04,990 and tight clearances while he sweeches 66 00:03:02,420 --> 00:03:04,990 those tubes 67 00:03:09,230 --> 00:03:13,120 [Music] 68 00:03:11,040 --> 00:03:15,280 once complete with the eighths wages 69 00:03:13,120 --> 00:03:21,910 this will allow the engineering teams to 70 00:03:15,280 --> 00:03:23,440 pressurize the system and with the crew 71 00:03:21,910 --> 00:03:24,849 support complete for the day Luca will 72 00:03:23,440 --> 00:03:27,099 ride the assignments back to the forward 73 00:03:24,849 --> 00:03:45,340 side at VSP - and prepare for our 74 00:03:27,099 --> 00:03:46,989 airlock ingress well Lucas riding the 75 00:03:45,340 --> 00:03:49,360 arm drill will be translating back and 76 00:03:46,989 --> 00:03:50,829 starting to bring bags back inside I've 77 00:03:49,360 --> 00:03:54,579 been left out on the ELC over the course 78 00:03:50,829 --> 00:03:56,410 of the e V a series and with both crew 79 00:03:54,579 --> 00:03:59,549 back at the airlock that'll complete EBA 80 00:03:56,410 --> 00:03:59,549 3 of the AMS repair 81 00:04:00,990 --> 00:04:03,050 you