1 00:00:00,000 --> 00:00:04,410 [Music] 2 00:00:01,550 --> 00:00:06,299 here we have Luca Andrew prepared for 3 00:00:04,410 --> 00:00:07,620 the second of the AMS repair EVs 4 00:00:06,299 --> 00:00:10,019 following a very successful leave a 5 00:00:07,620 --> 00:00:12,059 number one here we have Luca heading up 6 00:00:10,019 --> 00:00:15,630 the Cetus burr to meet the SSRMS to 7 00:00:12,059 --> 00:00:17,220 prepare for his flight to AMS while drew 8 00:00:15,630 --> 00:00:18,690 will be heading up the zetas burn with a 9 00:00:17,220 --> 00:00:21,510 tool bag and he'll be heading out 10 00:00:18,690 --> 00:00:23,820 directly to ELC to prepare his work site 11 00:00:21,510 --> 00:00:28,140 in to assist Luca in there Evi to repair 12 00:00:23,820 --> 00:00:28,920 work Luca has to pitch down the whiff 13 00:00:28,140 --> 00:00:31,019 extender here 14 00:00:28,920 --> 00:00:32,550 he left the API farmer fixing on the end 15 00:00:31,019 --> 00:00:34,230 of the arm on the end of the last TVA in 16 00:00:32,550 --> 00:00:35,700 order to save time on this one so he'll 17 00:00:34,230 --> 00:00:37,920 get the right setting set up here 18 00:00:35,700 --> 00:00:41,120 ingress the apfr and prepare for the 19 00:00:37,920 --> 00:00:41,120 flying over to AMS 20 00:00:47,410 --> 00:00:52,219 [Music] 21 00:00:57,739 --> 00:01:02,010 once in breasts into the first round the 22 00:00:59,999 --> 00:01:03,570 end of the canadarm2 there'll be another 23 00:01:02,010 --> 00:01:05,129 big maneuver over top of station with 24 00:01:03,570 --> 00:01:07,080 great views as Lucca heads to the 25 00:01:05,129 --> 00:01:10,850 Xenocide of AMS this time to work on 26 00:01:07,080 --> 00:01:10,850 some MLI covering some power cables 27 00:01:17,660 --> 00:01:23,280 the SSRMS will slide Lucca in between 28 00:01:20,460 --> 00:01:25,170 lc2 and AMS and he'll get to work with 29 00:01:23,280 --> 00:01:26,250 some Russian cutting tools to open up 30 00:01:25,170 --> 00:01:29,100 the mm a lot of multi-layer insulation 31 00:01:26,250 --> 00:01:30,810 in this area he'll be accessing two 32 00:01:29,100 --> 00:01:33,840 power cables that were on and thus for 33 00:01:30,810 --> 00:01:36,270 other hardware and we'll utilize those 34 00:01:33,840 --> 00:01:38,490 to connect up to a set of ev8 cables to 35 00:01:36,270 --> 00:01:39,840 prepare for the pump box arrival on TV 36 00:01:38,490 --> 00:01:45,379 number three 37 00:01:39,840 --> 00:01:45,379 [Music] 38 00:01:45,880 --> 00:01:49,820 once those cables are temps total open 39 00:01:48,290 --> 00:01:51,650 up yet more I'm aligned that area to 40 00:01:49,820 --> 00:01:54,920 prepare for the mechanical attach device 41 00:01:51,650 --> 00:01:57,860 our mad install on the beam this mad 42 00:01:54,920 --> 00:02:00,259 will be utilized on evey a 3/4 of the 43 00:01:57,860 --> 00:02:02,720 mechanical attachment of the pump box so 44 00:02:00,259 --> 00:02:04,130 following this test the power data and 45 00:02:02,720 --> 00:02:05,810 mechanical components will all be ready 46 00:02:04,130 --> 00:02:09,350 for that pump box to come right out on 47 00:02:05,810 --> 00:02:11,750 the beginning of EBA 3 completing that 48 00:02:09,350 --> 00:02:14,510 work the SSRMS will maneuver Luca from 49 00:02:11,750 --> 00:02:17,569 the Xenocide back a little bit Nader in 50 00:02:14,510 --> 00:02:21,410 between est LC 2 and AMS to the same 51 00:02:17,569 --> 00:02:24,050 work so he was at during EBA 1 from here 52 00:02:21,410 --> 00:02:26,420 he will use a large set of rough cutters 53 00:02:24,050 --> 00:02:28,130 to cut a fill line that will vent out 54 00:02:26,420 --> 00:02:30,650 the remaining co2 in the coolant system 55 00:02:28,130 --> 00:02:32,239 allowing for the fine detailed cuts that 56 00:02:30,650 --> 00:02:35,510 will be utilized to connect up this 57 00:02:32,239 --> 00:02:36,950 system on tv3 at the vertical support be 58 00:02:35,510 --> 00:02:39,769 more excited he'll have six tubes that 59 00:02:36,950 --> 00:02:41,269 I'll have to cut those six tubes we six 60 00:02:39,769 --> 00:02:43,220 of eight tubes that will be connected to 61 00:02:41,269 --> 00:02:45,100 the new pump system on the subsequent 62 00:02:43,220 --> 00:02:47,390 EBA 63 00:02:45,100 --> 00:02:49,720 those tubes as they're cut will be 64 00:02:47,390 --> 00:02:52,489 capped and identify with tube numbers 65 00:02:49,720 --> 00:02:55,160 from there the SSRMS will maneuver Luca 66 00:02:52,489 --> 00:02:56,630 below AMS for the final two cuts he'll 67 00:02:55,160 --> 00:02:59,030 open up the Emmaline that work site 68 00:02:56,630 --> 00:03:01,340 until install a tube support bracket 69 00:02:59,030 --> 00:03:02,540 which will protect the other sensitive a 70 00:03:01,340 --> 00:03:04,400 most Hardware in the stereo while he's 71 00:03:02,540 --> 00:03:06,079 working here and finished up with the 72 00:03:04,400 --> 00:03:08,320 two remaining cuts that will also be 73 00:03:06,079 --> 00:03:08,320 capped 74 00:03:09,520 --> 00:03:12,699 [Music] 75 00:03:13,970 --> 00:03:19,440 with eight of eight tubes now cut and 76 00:03:16,710 --> 00:03:21,390 capped the SSRMS will maneuver Luka back 77 00:03:19,440 --> 00:03:24,000 forth the face one of the trust where he 78 00:03:21,390 --> 00:03:25,770 got on and it'll egress the SSRMS there 79 00:03:24,000 --> 00:03:28,380 and head back in the airlock after 80 00:03:25,770 --> 00:03:30,120 successfully VA number two while he's 81 00:03:28,380 --> 00:03:31,260 riding back on the SSRMS drew will be 82 00:03:30,120 --> 00:03:33,120 cleaning up the bags that have been 83 00:03:31,260 --> 00:03:34,770 stood on you'll see two bearing that 84 00:03:33,120 --> 00:03:36,840 works I for the in-between time between 85 00:03:34,770 --> 00:03:38,340 the EVs and then translated back under 86 00:03:36,840 --> 00:03:42,840 the mobile transporter and back to the 87 00:03:38,340 --> 00:03:44,790 airlock and stuff this will set up the 88 00:03:42,840 --> 00:03:46,680 AMS in the station to bring out the new 89 00:03:44,790 --> 00:03:48,900 pump system at the beginning of VV a3 to 90 00:03:46,680 --> 00:03:51,920 have it installed ready for fluid power 91 00:03:48,900 --> 00:03:51,920 and data connections