1 00:00:04,859 --> 00:00:08,950 The crew will be starting out on the first of the AMS repair EVAs. Here we've got 2 00:00:08,950 --> 00:00:14,980 Luca Parmitano is EV1 and Drew Morgan is EV2. Luca is here picking up the whiff 3 00:00:14,980 --> 00:00:20,650 extender to install on the end of the Canadarm2, while Drew is breaking out 4 00:00:20,650 --> 00:00:23,409 some tool bags stowing them on the outside the airlock and also bringing 5 00:00:23,409 --> 00:00:28,119 something with him to translate up the truss as well. Here Luca proceeding up 6 00:00:28,119 --> 00:00:31,810 to meet the Canadarm2 where he will start to configuring that for the 7 00:00:31,810 --> 00:00:39,579 starters for pair series. So here's Drew will pass by Luca, head all the way out 8 00:00:39,579 --> 00:00:44,559 to AMS to the Express Logistics Carrier to where he will start setting out bags. 9 00:00:44,559 --> 00:00:48,190 Drew will make several trips between the airlock and the Express Logistics 10 00:00:48,190 --> 00:00:51,850 Carrier in order to bring all the tools for the repairs out to the work site and 11 00:00:51,850 --> 00:00:58,719 have them staged and ready for what Luca's arrival with SSRMS. So here Luca 12 00:00:58,719 --> 00:01:02,559 will be setting up the WIF Extender followed by the Articulating Portable 13 00:01:02,559 --> 00:01:05,979 Foot Restraint which will give him to reach necessary to perform the repairs 14 00:01:05,979 --> 00:01:10,509 on AMS since there are no handrails currently installed on that payload for 15 00:01:10,509 --> 00:01:15,229 repair activities. 16 00:01:15,229 --> 00:01:21,570 Once Luca has his tool bag and is on the end of the SSRMS he will fly a sweeping 17 00:01:21,570 --> 00:01:25,590 range of motion that will take him well over top of the ISS where he will get a 18 00:01:25,590 --> 00:01:29,789 great view of the space station and they will take lots of video and photos that 19 00:01:29,789 --> 00:01:35,130 we can use to keep an eye on the state of station. The arm will stretched out and 20 00:01:35,130 --> 00:01:38,219 wrapped around the AMS there will be several places of tight clearances, the 21 00:01:38,219 --> 00:01:42,810 arm operators will have to negotiate for Luca is at the aft and outboard work 22 00:01:42,810 --> 00:01:48,090 site here. You can see him flying up over top of the truss where the arm will wrap 23 00:01:48,090 --> 00:01:54,329 around the backside of AMS and push him in between AMS and the ELC in order to 24 00:01:54,329 --> 00:02:05,909 reach the worksite to repair AMS is thermal pump system. Once Luca is at that 25 00:02:05,909 --> 00:02:10,079 work site, he'll be removing a debris shield working with Drew that to access 26 00:02:10,079 --> 00:02:14,579 the primary work area of AMS repair. Here they're installing a handling aid 27 00:02:14,579 --> 00:02:19,799 that'll be used to handle this debris shield after its removed. They're about a 28 00:02:19,799 --> 00:02:22,980 dozen non captive fasters that'll be removed in order to release this debris 29 00:02:22,980 --> 00:02:26,579 shield, several will be under these capture cages and they'll be trapped 30 00:02:26,579 --> 00:02:30,810 that way and several will be released using capture forks to be put into a 31 00:02:30,810 --> 00:02:37,760 separate capture block so that they are managed and not released. 32 00:02:37,760 --> 00:02:41,099 Once all the fasteners release from the debris shield Luca will hand it off to 33 00:02:41,099 --> 00:02:44,609 Drew who will be in his own foot restraint and he will face aft on the 34 00:02:44,609 --> 00:02:50,370 ISS and jettison that debris shield. Due to its large size it is not easy to put 35 00:02:50,370 --> 00:02:54,660 that back at the airlock so jettison is the optimum choice for that shield. 36 00:02:56,440 --> 00:02:59,620 Once the debris shield has been removed and jettisoned, Luca and Drew will work 37 00:02:59,639 --> 00:03:03,359 together to install other hand rails. Here we've installed that the first 38 00:03:03,359 --> 00:03:08,280 three handrails the dido beam handrail, then Drew will hand over two more 39 00:03:08,280 --> 00:03:12,329 handrails that the crew will install that they are the vacuum case handrails this 40 00:03:12,329 --> 00:03:16,470 will allow Luca and Drew better access and mobility at the worksite preparation 41 00:03:16,470 --> 00:03:21,209 for the second through fourth EVA of the series. Following the handrail 42 00:03:21,209 --> 00:03:25,079 installation crews will close up their tool bags and make their way back to the 43 00:03:25,079 --> 00:03:28,920 airlock here Luca is on the end of the arm and will repeat his translation on 44 00:03:28,920 --> 00:03:33,840 the end of the arm back to the front of trust. While he's flying on the arm 45 00:03:33,840 --> 00:03:38,250 Drew will translate around the outside of the ELC and translate back under the 46 00:03:38,250 --> 00:03:42,719 mobile transporter back to the airlock for the end of the first of the AMS 47 00:03:42,720 --> 00:03:44,220 repair EVA's.