1 00:00:06,240 --> 00:00:08,720 Hi, 2 00:00:06,560 --> 00:00:12,559 My name is Howard Hu. I am the acting 3 00:00:08,720 --> 00:00:14,719 program manager for NASA's Orion program. 4 00:00:12,559 --> 00:00:16,720 We are very excited that we could share 5 00:00:14,719 --> 00:00:18,800 with you the progress of our three 6 00:00:16,720 --> 00:00:20,480 spacecraft that is going to support the 7 00:00:18,800 --> 00:00:22,960 Artemis missions. 8 00:00:20,480 --> 00:00:23,840 Orion is NASA's next generation human 9 00:00:22,960 --> 00:00:26,240 spacecraft 10 00:00:23,840 --> 00:00:28,240 taking the first woman and the next man 11 00:00:26,240 --> 00:00:30,720 to the lunar surface. 12 00:00:28,240 --> 00:00:32,480 We are very excited to be here and share 13 00:00:30,720 --> 00:00:35,360 with you our progress. 14 00:00:32,480 --> 00:00:36,880 Now we can't do this without the very 15 00:00:35,360 --> 00:00:39,600 many people that support the 16 00:00:36,880 --> 00:00:40,800 Orion program and of course we have 17 00:00:39,600 --> 00:00:42,960 suppliers 18 00:00:40,800 --> 00:00:44,559 and people who help build the spacecraft 19 00:00:42,960 --> 00:00:47,039 across all 50 states including 20 00:00:44,559 --> 00:00:49,200 Washington DC and Puerto Rico. 21 00:00:47,039 --> 00:00:51,360 Now we also have our European partners 22 00:00:49,200 --> 00:00:54,239 who are significant contributors to the 23 00:00:51,360 --> 00:00:55,520 Orion program across 10 countries in 24 00:00:54,239 --> 00:00:58,000 Europe. They help 25 00:00:55,520 --> 00:00:59,440 also build the spacecraft parts and 26 00:00:58,000 --> 00:01:02,160 components (that) are necessary 27 00:00:59,440 --> 00:01:03,760 for us to fly to the Moon. Let me tell 28 00:01:02,160 --> 00:01:06,159 you a little bit about the Artemis I (one) 29 00:01:03,760 --> 00:01:08,240 spacecraft. Earlier this year we just 30 00:01:06,159 --> 00:01:09,040 completed a very important system level 31 00:01:08,240 --> 00:01:11,680 test 32 00:01:09,040 --> 00:01:12,320 that demonstrated Orion's ability to 33 00:01:11,680 --> 00:01:15,360 survive 34 00:01:12,320 --> 00:01:17,680 and operate robustly in space. 35 00:01:15,360 --> 00:01:18,720 It was the environmental test at Plum 36 00:01:17,680 --> 00:01:21,840 Brook Station 37 00:01:18,720 --> 00:01:24,000 where we simulated the space environment 38 00:01:21,840 --> 00:01:26,080 for vacuum and temperature. 39 00:01:24,000 --> 00:01:28,880 And of course Orion passed with flying 40 00:01:26,080 --> 00:01:31,200 colors and demonstrated our readiness 41 00:01:28,880 --> 00:01:32,000 for flight. Now we only have a few 42 00:01:31,200 --> 00:01:34,640 remaining 43 00:01:32,000 --> 00:01:35,759 assembly tasks at KSC to pull the entire 44 00:01:34,640 --> 00:01:37,840 vehicle together 45 00:01:35,759 --> 00:01:39,119 and then shortly after that we will be 46 00:01:37,840 --> 00:01:41,200 ready to hand over 47 00:01:39,119 --> 00:01:43,119 to our ground processing team and 48 00:01:41,200 --> 00:01:44,640 stacking on the Space Launch System so 49 00:01:43,119 --> 00:01:47,680 (a) very exciting time 50 00:01:44,640 --> 00:01:49,759 for us regarding Artemis I (one). 51 00:01:47,680 --> 00:01:52,079 Now Artemis II (two) we're also making 52 00:01:49,759 --> 00:01:54,960 significant progress there. Just recently 53 00:01:52,079 --> 00:01:56,719 we finished bonding over 180 tiles for 54 00:01:54,960 --> 00:02:00,479 the heat shield and the heat shield 55 00:01:56,719 --> 00:02:02,799 is at the bottom of the crew module 56 00:02:00,479 --> 00:02:04,719 which keeps the crew safe as we re-enter 57 00:02:02,799 --> 00:02:06,560 the atmosphere. It's a very high 58 00:02:04,719 --> 00:02:08,319 temperature 5,000 degrees 59 00:02:06,560 --> 00:02:10,479 so the the crew needs a lot of 60 00:02:08,319 --> 00:02:12,319 protection and that's what the 61 00:02:10,479 --> 00:02:13,680 heat shield material provides and so 62 00:02:12,319 --> 00:02:15,520 very exciting 63 00:02:13,680 --> 00:02:17,200 news there that we were able to 64 00:02:15,520 --> 00:02:18,160 finish there. And of course we're making 65 00:02:17,200 --> 00:02:20,840 a lot of progress 66 00:02:18,160 --> 00:02:22,080 pulling the entire spacecraft 67 00:02:20,840 --> 00:02:25,200 together 68 00:02:22,080 --> 00:02:27,120 for Artemis II (two) doing a lot of 69 00:02:25,200 --> 00:02:28,239 work installing the hardware that's 70 00:02:27,120 --> 00:02:31,040 needed 71 00:02:28,239 --> 00:02:32,160 to operate the vehicle and of course 72 00:02:31,040 --> 00:02:35,040 getting all the 73 00:02:32,160 --> 00:02:36,720 electronics and other components inside 74 00:02:35,040 --> 00:02:38,959 the crew module as well. So, 75 00:02:36,720 --> 00:02:40,800 lots of great progress there. And lots of 76 00:02:38,959 --> 00:02:42,720 great progress over in Europe as well 77 00:02:40,800 --> 00:02:45,200 as the Europeans are pulling their final 78 00:02:42,720 --> 00:02:47,040 pieces of the European service module 79 00:02:45,200 --> 00:02:48,560 that provides the power and the 80 00:02:47,040 --> 00:02:50,720 propulsive capability 81 00:02:48,560 --> 00:02:52,080 for the spacecraft so that's coming 82 00:02:50,720 --> 00:02:53,680 along as well. And of course 83 00:02:52,080 --> 00:02:55,360 they will be delivering their part of 84 00:02:53,680 --> 00:02:56,879 the spacecraft and then 85 00:02:55,360 --> 00:03:00,159 we will be putting that together and be 86 00:02:56,879 --> 00:03:02,959 ready for Artemis II (two) in the future 87 00:03:00,159 --> 00:03:05,040 as well. And finally for Artemis III (three) we're 88 00:03:02,959 --> 00:03:06,560 also making great progress there. 89 00:03:05,040 --> 00:03:08,720 You know, the Europeans already have 90 00:03:06,560 --> 00:03:11,040 their primary structure in work. 91 00:03:08,720 --> 00:03:12,879 Thales Alenia is delivering that in late 92 00:03:11,040 --> 00:03:14,879 September so that's great progress. 93 00:03:12,879 --> 00:03:17,040 And of course, on our own crew module. 94 00:03:14,879 --> 00:03:18,879 We've got the first panel built. 95 00:03:17,040 --> 00:03:20,800 This is the panel with the 96 00:03:18,879 --> 00:03:22,720 windows so it's very exciting that we're 97 00:03:20,800 --> 00:03:25,680 gonna have this capability 98 00:03:22,720 --> 00:03:27,599 delivered in the near future and 99 00:03:25,680 --> 00:03:28,799 very excited that that's completed. 100 00:03:27,599 --> 00:03:30,879 And that's the first piece that we're 101 00:03:28,799 --> 00:03:32,560 gonna have for Artemis III (three) on the crew 102 00:03:30,879 --> 00:03:35,040 module. 103 00:03:32,560 --> 00:03:35,840 Now I want to congratulate Lockheed and 104 00:03:35,040 --> 00:03:38,480 AMRO for 105 00:03:35,840 --> 00:03:39,680 making this possible. It's 106 00:03:38,480 --> 00:03:41,200 certainly very exciting 107 00:03:39,680 --> 00:03:43,280 you know. We're getting close to flight 108 00:03:41,200 --> 00:03:44,879 for Artemis I (one) and then we're making 109 00:03:43,280 --> 00:03:46,799 great progress on II (two) and of course 110 00:03:44,879 --> 00:03:48,799 we've started making great progress on 111 00:03:46,799 --> 00:03:50,319 Artemis III (three) as well so really exciting 112 00:03:48,799 --> 00:03:52,080 times for the program. 113 00:03:50,319 --> 00:03:53,840 With that, I am going to turn over to 114 00:03:52,080 --> 00:03:54,319 Lockheed Martin. I will introduce Mike 115 00:03:53,840 --> 00:03:56,319 Hawes 116 00:03:54,319 --> 00:03:57,360 who is the vice president for Human 117 00:03:56,319 --> 00:03:59,280 Exploration 118 00:03:57,360 --> 00:04:01,280 and also the Lockheed program manager 119 00:03:59,280 --> 00:04:04,319 for Orion. 120 00:04:01,280 --> 00:04:06,239 Well, thank you Howard. As NASA's prime 121 00:04:04,319 --> 00:04:08,080 contractor for the Orion 122 00:04:06,239 --> 00:04:09,360 program and the spacecraft we're 123 00:04:08,080 --> 00:04:12,159 talking about, 124 00:04:09,360 --> 00:04:13,200 we certainly work constantly day and 125 00:04:12,159 --> 00:04:14,720 night to 126 00:04:13,200 --> 00:04:16,799 meet these aggressive schedules and to 127 00:04:14,720 --> 00:04:18,400 make sure that we're ready 128 00:04:16,799 --> 00:04:20,079 for the Artemis missions as Howard 129 00:04:18,400 --> 00:04:22,400 described. 130 00:04:20,079 --> 00:04:23,680 Today we're particularly excited because 131 00:04:22,400 --> 00:04:26,479 we're here to highlight 132 00:04:23,680 --> 00:04:27,759 one of our great suppliers so we'll be 133 00:04:26,479 --> 00:04:31,199 joined virtually 134 00:04:27,759 --> 00:04:33,360 by Mike Riley from AMRO 135 00:04:31,199 --> 00:04:34,800 manufacturing which is in El Monte, 136 00:04:33,360 --> 00:04:38,000 California. 137 00:04:34,800 --> 00:04:38,240 And AMRO manufactures the cone panels or 138 00:04:38,000 --> 00:04:40,639 the 139 00:04:38,240 --> 00:04:42,000 sloped pieces. If you think of the 140 00:04:40,639 --> 00:04:43,840 Orion capsule, these 141 00:04:42,000 --> 00:04:46,479 sloped pieces along the top of the 142 00:04:43,840 --> 00:04:48,160 capsule are really critical components 143 00:04:46,479 --> 00:04:51,040 and that's what the AMRO team 144 00:04:48,160 --> 00:04:53,120 manufactures. We're actually 145 00:04:51,040 --> 00:04:54,479 celebrating the completion of that first 146 00:04:53,120 --> 00:04:57,440 panel 147 00:04:54,479 --> 00:04:58,800 and so I would like to actually ask 148 00:04:57,440 --> 00:05:01,919 Mike Riley 149 00:04:58,800 --> 00:05:03,840 to talk about AMRO. Mike is the CEO of 150 00:05:01,919 --> 00:05:05,600 AMRO. He's actually the third generation 151 00:05:03,840 --> 00:05:07,039 of the Riley family 152 00:05:05,600 --> 00:05:10,160 to run AMRO and they have been a 153 00:05:07,039 --> 00:05:12,479 fantastic partner for the Orion program. 154 00:05:10,160 --> 00:05:14,160 So Mike, I'll turn it over to you and ask 155 00:05:12,479 --> 00:05:15,039 you to explain how you machine the 156 00:05:14,160 --> 00:05:17,759 panels 157 00:05:15,039 --> 00:05:20,080 and have your team show us what it is 158 00:05:17,759 --> 00:05:22,639 that you do so well. 159 00:05:20,080 --> 00:05:24,800 Thanks for the introduction Mike. ARMO 160 00:05:22,639 --> 00:05:26,720 has been in business for over 40 years 161 00:05:24,800 --> 00:05:28,880 and I'm honored to be a third generation 162 00:05:26,720 --> 00:05:30,479 member of the AMRO family. 163 00:05:28,880 --> 00:05:32,160 AMRO has been involved in the Orion 164 00:05:30,479 --> 00:05:34,240 program since day one 165 00:05:32,160 --> 00:05:36,960 and we are honored and excited to see 166 00:05:34,240 --> 00:05:39,199 what the program has evolved into. 167 00:05:36,960 --> 00:05:40,880 Standing next to me here we have one of 168 00:05:39,199 --> 00:05:42,880 the cone panels for the Orion pressure 169 00:05:40,880 --> 00:05:45,280 vessel -- the window panel. 170 00:05:42,880 --> 00:05:46,960 It's these windows that the next 171 00:05:45,280 --> 00:05:48,479 American astronauts will be looking at 172 00:05:46,960 --> 00:05:50,160 the lunar surface through. 173 00:05:48,479 --> 00:05:51,680 The first astronauts to do so since 174 00:05:50,160 --> 00:05:53,440 Apollo 17. 175 00:05:51,680 --> 00:05:55,280 This panel is currently complete and 176 00:05:53,440 --> 00:05:57,039 ready to ship to Michoud. 177 00:05:55,280 --> 00:05:58,800 We are also working on the second and 178 00:05:57,039 --> 00:06:00,639 third cone panels which will be 179 00:05:58,800 --> 00:06:02,000 completed soon and also on their way to 180 00:06:00,639 --> 00:06:03,840 Michoud. 181 00:06:02,000 --> 00:06:07,360 Bola, tell us a little bit about your 182 00:06:03,840 --> 00:06:09,280 experience working on the Orion panels. 183 00:06:07,360 --> 00:06:10,560 These panels are very complex. We 184 00:06:09,280 --> 00:06:13,199 understand the importance 185 00:06:10,560 --> 00:06:13,680 of position and safety required here at 186 00:06:13,199 --> 00:06:16,720 AMRO. 187 00:06:13,680 --> 00:06:17,120 We use the latest technology to make 188 00:06:16,720 --> 00:06:20,240 these 189 00:06:17,120 --> 00:06:22,240 special panels. We also gotta make sure 190 00:06:20,240 --> 00:06:23,120 we make good parts so the Astronauts 191 00:06:22,240 --> 00:06:26,880 come back home 192 00:06:23,120 --> 00:06:26,880 safe to see their families. 193 00:06:28,080 --> 00:06:31,919 I'm here with Program Manager David 194 00:06:29,840 --> 00:06:32,720 Thompson. David and I are standing in 195 00:06:31,919 --> 00:06:35,759 between 196 00:06:32,720 --> 00:06:36,880 two SLS panels. David can you tell us a 197 00:06:35,759 --> 00:06:38,479 little bit about the panels that we're 198 00:06:36,880 --> 00:06:40,560 standing in between? 199 00:06:38,479 --> 00:06:42,560 Yeah, I'd love to Mike. Over here to my 200 00:06:40,560 --> 00:06:45,680 left, we have an engine section 201 00:06:42,560 --> 00:06:47,759 core stage barrel panel 202 00:06:45,680 --> 00:06:49,280 for SLS. Right now you can see it's in 203 00:06:47,759 --> 00:06:50,800 the flat configuration. 204 00:06:49,280 --> 00:06:52,560 We're getting it ready for inspection. 205 00:06:50,800 --> 00:06:54,400 Then we'll head over to forming. 206 00:06:52,560 --> 00:06:56,560 And then over here to the right, we have 207 00:06:54,400 --> 00:06:59,680 an LVSA forward panel. 208 00:06:56,560 --> 00:07:01,840 LVSA is launch vehicle stage adapter. 209 00:06:59,680 --> 00:07:04,319 It's in the same flat state it will be 210 00:07:01,840 --> 00:07:06,319 going over to forming after inspection. 211 00:07:04,319 --> 00:07:08,080 After this, you'll see a nice great 212 00:07:06,319 --> 00:07:09,919 contour. 213 00:07:08,080 --> 00:07:12,080 And then we will get it ready for the 214 00:07:09,919 --> 00:07:13,599 customer. 215 00:07:12,080 --> 00:07:15,039 Excellent! Thanks, David. Thanks for all 216 00:07:13,599 --> 00:07:16,319 your hard work to make this program a 217 00:07:15,039 --> 00:07:19,440 success. 218 00:07:16,319 --> 00:07:21,520 Now, Mr. Howard Hu, back to you. All right, 219 00:07:19,440 --> 00:07:23,680 Now we'll answer some questions that 220 00:07:21,520 --> 00:07:26,240 we received. The first one 221 00:07:23,680 --> 00:07:27,520 is from the Houston Chronicle -- Andrea 222 00:07:26,240 --> 00:07:31,199 Leinfelder. 223 00:07:27,520 --> 00:07:33,440 She asks, when is Artemis III (three) set to launch 224 00:07:31,199 --> 00:07:35,360 and what is Lockheed Martin's doing to 225 00:07:33,440 --> 00:07:36,560 ensure Orion is ready to meet this 226 00:07:35,360 --> 00:07:38,000 deadline. 227 00:07:36,560 --> 00:07:39,360 Let me see, I'll take the first part of 228 00:07:38,000 --> 00:07:40,400 the question and then I'll hand over to 229 00:07:39,360 --> 00:07:43,280 Mike Hawes 230 00:07:40,400 --> 00:07:43,840 to answer the second part. Right now, 231 00:07:43,280 --> 00:07:46,879 Artemis 232 00:07:43,840 --> 00:07:49,280 III (three) -- we're targeting 2024 233 00:07:46,879 --> 00:07:50,160 to put the first woman and the next man 234 00:07:49,280 --> 00:07:51,759 on the Moon. 235 00:07:50,160 --> 00:07:53,520 Very exciting times. We're making great 236 00:07:51,759 --> 00:07:55,440 progress. Not only is Lockheed making 237 00:07:53,520 --> 00:07:56,639 great progress, but also the Europeans as 238 00:07:55,440 --> 00:07:58,240 I mentioned earlier (are) 239 00:07:56,639 --> 00:07:59,919 making significant progress with the 240 00:07:58,240 --> 00:08:02,160 primary structure so 241 00:07:59,919 --> 00:08:03,039 really great work going on there and 242 00:08:02,160 --> 00:08:05,199 we'll be ready 243 00:08:03,039 --> 00:08:06,960 to meet those challenges and get us to 244 00:08:05,199 --> 00:08:09,360 the Moon in 2024. 245 00:08:06,960 --> 00:08:10,879 So with that, I'll turn over to Mike to 246 00:08:09,360 --> 00:08:12,400 answer the second part. 247 00:08:10,879 --> 00:08:13,840 Thanks, Howard. So let's talk about what 248 00:08:12,400 --> 00:08:15,360 the Lockheed Martin team is doing 249 00:08:13,840 --> 00:08:16,960 particularly for Artemis III (three). I mean, 250 00:08:15,360 --> 00:08:19,599 we've already talked about 251 00:08:16,960 --> 00:08:20,800 we're actually working on completing 252 00:08:19,599 --> 00:08:22,800 Artemis I (one), 253 00:08:20,800 --> 00:08:24,240 building up Artemis II (two) and now starting 254 00:08:22,800 --> 00:08:27,360 the manufacturing 255 00:08:24,240 --> 00:08:29,199 of Artemis III (three). So, we've talked about the 256 00:08:27,360 --> 00:08:30,560 panel manufacturing and we'll talk a bit 257 00:08:29,199 --> 00:08:33,200 more about that 258 00:08:30,560 --> 00:08:34,800 but we have parts coming together from 259 00:08:33,200 --> 00:08:35,839 our suppliers across the country like 260 00:08:34,800 --> 00:08:37,839 Howard said. 261 00:08:35,839 --> 00:08:38,959 We have suppliers in all 50 states and 262 00:08:37,839 --> 00:08:40,880 Puerto Rico 263 00:08:38,959 --> 00:08:43,839 and so we are pulling all of those 264 00:08:40,880 --> 00:08:45,760 pieces together. We're making deliveries 265 00:08:43,839 --> 00:08:48,240 to our team at KSC. We're making 266 00:08:45,760 --> 00:08:50,640 deliveries to the European team 267 00:08:48,240 --> 00:08:53,760 and we will continue through the 268 00:08:50,640 --> 00:08:57,680 next year. If you look at 269 00:08:53,760 --> 00:08:58,399 2023 targets to have this spacecraft 270 00:08:57,680 --> 00:09:01,600 ready 271 00:08:58,399 --> 00:09:03,200 to be able to fly in 24 we have a lot 272 00:09:01,600 --> 00:09:05,120 that's going to be coming together just 273 00:09:03,200 --> 00:09:07,040 in the next year. 274 00:09:05,120 --> 00:09:08,160 All right, thanks Mike. Let's see, we've 275 00:09:07,040 --> 00:09:10,720 got another question. 276 00:09:08,160 --> 00:09:11,440 This one I think is is suited for 277 00:09:10,720 --> 00:09:14,160 Mike Riley 278 00:09:11,440 --> 00:09:14,880 at AMRO to answer. Phillip Sloss with 279 00:09:14,160 --> 00:09:17,200 280 00:09:14,880 --> 00:09:20,160 NASA Spaceflight.com asks -- Can you tell 281 00:09:17,200 --> 00:09:21,839 us how the cone panel is manufactured at 282 00:09:20,160 --> 00:09:23,839 AMRO and what is the status of the 283 00:09:21,839 --> 00:09:27,040 other two cone panels for Artemis 284 00:09:23,839 --> 00:09:29,279 III (three)? Sure thing Howard, 285 00:09:27,040 --> 00:09:30,320 that's a great question. Phillip, here 286 00:09:29,279 --> 00:09:34,000 with me to answer that 287 00:09:30,320 --> 00:09:36,480 is Program Manager David Thompson. 288 00:09:34,000 --> 00:09:37,600 Thank you, Mike. So how is a cone panel 289 00:09:36,480 --> 00:09:39,680 made? 290 00:09:37,600 --> 00:09:41,200 So it starts out as a flat plate 291 00:09:39,680 --> 00:09:43,839 weighing approximately 292 00:09:41,200 --> 00:09:47,519 13,000 pounds. As you can see here, it's 293 00:09:43,839 --> 00:09:50,320 about 200 pounds in the formed condition. 294 00:09:47,519 --> 00:09:52,240 This panel is a culmination of different 295 00:09:50,320 --> 00:09:55,600 departments here at AMRO. 296 00:09:52,240 --> 00:09:58,320 The first is forming, then we go into 297 00:09:55,600 --> 00:09:59,040 five-axis machining. We have CNC 298 00:09:58,320 --> 00:10:01,120 programming. 299 00:09:59,040 --> 00:10:02,160 We have laser inspection, a heat age 300 00:10:01,120 --> 00:10:05,200 operation. 301 00:10:02,160 --> 00:10:07,279 We go out to outside processing and then 302 00:10:05,200 --> 00:10:09,040 finally we have final assembly. 303 00:10:07,279 --> 00:10:11,040 The other two cone panels which will be 304 00:10:09,040 --> 00:10:12,720 friction stir welded to this panel 305 00:10:11,040 --> 00:10:15,200 are currently in production and will be 306 00:10:12,720 --> 00:10:17,760 completed in a couple of months. 307 00:10:15,200 --> 00:10:18,560 All right, we have another question. 308 00:10:17,760 --> 00:10:20,399 This one is... 309 00:10:18,560 --> 00:10:22,240 let's see if Mike Hawes could answer 310 00:10:20,399 --> 00:10:24,240 this one. Andrea at the Houston 311 00:10:22,240 --> 00:10:26,320 Chronicle also wants to know 312 00:10:24,240 --> 00:10:27,760 how many panels total come together on 313 00:10:26,320 --> 00:10:30,720 the Orion spacecraft 314 00:10:27,760 --> 00:10:33,360 and how many parts, nuts, bolts are need 315 00:10:30,720 --> 00:10:36,720 to assemble the entire spacecraft? 316 00:10:33,360 --> 00:10:38,720 So Mike, I think you got a tough one. 317 00:10:36,720 --> 00:10:40,640 So, obviously there are thousands of 318 00:10:38,720 --> 00:10:42,640 components that come together to 319 00:10:40,640 --> 00:10:44,839 make the Orion spacecraft and 320 00:10:42,640 --> 00:10:46,880 again a reference back to the crew 321 00:10:44,839 --> 00:10:48,959 module, 322 00:10:46,880 --> 00:10:51,120 just to build the crew module we're 323 00:10:48,959 --> 00:10:54,000 going to talk in the order of 200,000 324 00:10:51,120 --> 00:10:56,959 parts. When we talk about you know 325 00:10:54,000 --> 00:11:00,160 all of the fasteners and bonds and 326 00:10:56,959 --> 00:11:02,000 the tiles that cover the surface, so 327 00:11:00,160 --> 00:11:03,600 hundreds of thousands of parts and 328 00:11:02,000 --> 00:11:05,200 that doesn't even include 329 00:11:03,600 --> 00:11:07,040 the European service module and the 330 00:11:05,200 --> 00:11:08,720 launch abort system that actually gets 331 00:11:07,040 --> 00:11:11,600 stacked on top of this. 332 00:11:08,720 --> 00:11:13,600 But I want to focus on the the key 333 00:11:11,600 --> 00:11:14,240 pieces of the pressure vessel as we call 334 00:11:13,600 --> 00:11:16,160 it 335 00:11:14,240 --> 00:11:18,160 and how we have improved that over 336 00:11:16,160 --> 00:11:20,240 time. We're focused here 337 00:11:18,160 --> 00:11:22,160 with the AMRO team on the cone panels. 338 00:11:20,240 --> 00:11:24,399 There are three cone panels 339 00:11:22,160 --> 00:11:26,000 but there are only four other pieces of 340 00:11:24,399 --> 00:11:26,959 the structure that all get welded 341 00:11:26,000 --> 00:11:29,760 together. 342 00:11:26,959 --> 00:11:31,600 When we started on the Orion project we 343 00:11:29,760 --> 00:11:32,959 were over 30 panels that had to be 344 00:11:31,600 --> 00:11:35,200 welded together 345 00:11:32,959 --> 00:11:36,399 and so over time we have simplified that 346 00:11:35,200 --> 00:11:39,360 process down to just 347 00:11:36,399 --> 00:11:41,040 seven and we've saved mass, we save time 348 00:11:39,360 --> 00:11:44,000 we save cost 349 00:11:41,040 --> 00:11:44,720 in order to do that. And so, this is the 350 00:11:44,000 --> 00:11:46,880 first panel 351 00:11:44,720 --> 00:11:47,760 that we've been talking about today. We 352 00:11:46,880 --> 00:11:49,920 will 353 00:11:47,760 --> 00:11:52,079 continue to deliver panels. AMRO will 354 00:11:49,920 --> 00:11:54,560 continue to deliver those panels 355 00:11:52,079 --> 00:11:56,480 through the course of the fall. All seven 356 00:11:54,560 --> 00:11:57,360 major pieces of the pressure vessel 357 00:11:56,480 --> 00:11:58,800 structure 358 00:11:57,360 --> 00:12:02,000 will come together at the Michoud 359 00:11:58,800 --> 00:12:05,279 Assembly Facility in New Orleans 360 00:12:02,000 --> 00:12:06,880 by this fall, late this fall. 361 00:12:05,279 --> 00:12:08,800 And then we'll start to weld those 362 00:12:06,880 --> 00:12:10,079 together with the friction stir welding 363 00:12:08,800 --> 00:12:12,320 process that 364 00:12:10,079 --> 00:12:14,480 we have developed on earlier NASA 365 00:12:12,320 --> 00:12:18,000 programs and used today 366 00:12:14,480 --> 00:12:19,839 by September of 21. Then we would 367 00:12:18,000 --> 00:12:22,320 actually expect to deliver that pressure 368 00:12:19,839 --> 00:12:24,639 vessel to Florida to the team in the 369 00:12:22,320 --> 00:12:26,079 Operations and Checkout facility and 370 00:12:24,639 --> 00:12:28,880 then they'll really start building up 371 00:12:26,079 --> 00:12:30,800 the entire spacecraft. 372 00:12:28,880 --> 00:12:33,600 And finally we have one last question 373 00:12:30,800 --> 00:12:35,760 from Leonard David from Newsspace.com. 374 00:12:33,600 --> 00:12:37,200 He asks -- with the increasing role of 375 00:12:35,760 --> 00:12:39,920 entrepreneurs in space, 376 00:12:37,200 --> 00:12:41,279 how best can the larger space primes 377 00:12:39,920 --> 00:12:44,399 work with these groups? 378 00:12:41,279 --> 00:12:45,760 Any advice on this? Let's see, I think Mike 379 00:12:44,399 --> 00:12:47,279 Hawes and I both could answer this 380 00:12:45,760 --> 00:12:49,600 question. I'll start first. 381 00:12:47,279 --> 00:12:50,959 You know, we are certainly working 382 00:12:49,600 --> 00:12:53,839 together 383 00:12:50,959 --> 00:12:55,040 with the commercial partners to improve 384 00:12:53,839 --> 00:12:57,920 not only 385 00:12:55,040 --> 00:12:59,200 their design but also give them data so 386 00:12:57,920 --> 00:13:02,240 we've given a range of 387 00:12:59,200 --> 00:13:03,440 not only requirements data, products test 388 00:13:02,240 --> 00:13:06,399 data that 389 00:13:03,440 --> 00:13:07,200 we've generated, reports, and of course 390 00:13:06,399 --> 00:13:10,399 all the 391 00:13:07,200 --> 00:13:13,120 design aspects that are important to 392 00:13:10,399 --> 00:13:14,320 the commercial space flight programs we 393 00:13:13,120 --> 00:13:16,160 provided as well. 394 00:13:14,320 --> 00:13:17,519 And some of the examples include 395 00:13:16,160 --> 00:13:19,760 parachute data which 396 00:13:17,519 --> 00:13:20,880 obviously provides a safe landing for 397 00:13:19,760 --> 00:13:24,079 the crew, 398 00:13:20,880 --> 00:13:27,440 aerothermal aerodynamics database 399 00:13:24,079 --> 00:13:30,560 and data, all the testing that we've done 400 00:13:27,440 --> 00:13:31,680 across the board, the GNC guidance 401 00:13:30,560 --> 00:13:34,959 navigation control 402 00:13:31,680 --> 00:13:37,040 design, and also re-entry data. 403 00:13:34,959 --> 00:13:38,480 So lots of significant items -- over a 404 00:13:37,040 --> 00:13:41,760 thousand products 405 00:13:38,480 --> 00:13:43,440 that we've given to these commercial 406 00:13:41,760 --> 00:13:45,839 partners to enable them 407 00:13:43,440 --> 00:13:47,040 to be successful as well. So I look (it) as 408 00:13:45,839 --> 00:13:48,880 a partnership 409 00:13:47,040 --> 00:13:51,360 across all the NASA programs to help 410 00:13:48,880 --> 00:13:54,639 each other and learn from each other. 411 00:13:51,360 --> 00:13:56,160 And let's see if if Mike has additional 412 00:13:54,639 --> 00:13:58,320 inputs. 413 00:13:56,160 --> 00:13:59,600 So the question of entrepreneurial 414 00:13:58,320 --> 00:14:01,440 companies is 415 00:13:59,600 --> 00:14:03,519 a really fascinating one. We've seen 416 00:14:01,440 --> 00:14:04,880 so much happen in just the last few 417 00:14:03,519 --> 00:14:06,399 years 418 00:14:04,880 --> 00:14:08,000 with the supply chain that we have on 419 00:14:06,399 --> 00:14:10,160 Orion and Howard didn't mention that 420 00:14:08,000 --> 00:14:12,480 earlier that we have 421 00:14:10,160 --> 00:14:13,680 hundreds of companies across the country 422 00:14:12,480 --> 00:14:16,160 that are all 423 00:14:13,680 --> 00:14:17,680 providing and probably half of our 424 00:14:16,160 --> 00:14:21,600 suppliers are actually 425 00:14:17,680 --> 00:14:21,600 small businesses so when we talk about 426 00:14:22,000 --> 00:14:25,839 newly started companies entrepreneurial 427 00:14:23,920 --> 00:14:26,880 companies they certainly fit in that 428 00:14:25,839 --> 00:14:30,000 kind of range. 429 00:14:27,360 --> 00:14:32,240 All right. Thank you to Dr. Hawes and 430 00:14:30,000 --> 00:14:32,880 Mike Riley for helping me today and 431 00:14:32,240 --> 00:14:36,079 joining us 432 00:14:32,880 --> 00:14:38,000 on giving a status of Orion. 433 00:14:36,079 --> 00:14:39,199 Today it's been a great day What 434 00:14:38,000 --> 00:14:41,040 getting 435 00:14:39,199 --> 00:14:43,040 a discussion with you in terms of our 436 00:14:41,040 --> 00:14:45,199 progress and 437 00:14:43,040 --> 00:14:46,079 fielding some questions from the 438 00:14:45,199 --> 00:14:48,880 reporters, so 439 00:14:46,079 --> 00:14:50,560 appreciate that, and stay tuned we've 440 00:14:48,880 --> 00:14:51,360 got a lot of exciting things happening 441 00:14:50,560 --> 00:14:52,720 in Orion. 442 00:14:51,360 --> 00:14:54,480 we've got a lot of great progress, like I 443 00:14:52,720 --> 00:14:56,880 said across all three vehicles. 444 00:14:54,480 --> 00:14:58,800 We'll certainly talk about 445 00:14:56,880 --> 00:15:00,240 getting ready for launch, or what we 446 00:14:58,800 --> 00:15:02,079 call path to the pad, 447 00:15:00,240 --> 00:15:03,839 and supporting all our Artemis missions 448 00:15:02,079 --> 00:15:05,040 going forward it's a very exciting time 449 00:15:03,839 --> 00:15:07,440 for us at NASA 450 00:15:05,040 --> 00:15:08,240 and looking forward to you joining us on 451 00:15:07,440 --> 00:15:13,839 that journey. 452 00:15:08,240 --> 00:15:13,839 Thank you!